Quick-Drying Roof Screed Beside Newbury Racecourse: 1,000+ m² First Phase
SW Build designs, supplies and installs over 1,000 m² of bonded roof levelling screed beside Newbury Racecourse, using TALVUDO Xtreme ahead of an Alumasc roofing system.
SW Build designs, supplies and installs over 1,000 m² of bonded roof levelling screed beside Newbury Racecourse, using TALVUDO Xtreme ahead of an Alumasc roofing system.
Water appeared in the corridor after a Victorian kitchen was tanked. We installed combined waterproofing while retaining the existing head height.
How we reviewed a proposed basement waterproofing system and agreed a damp treatment for a lower ground floor property in Redland, Bristol.